Operations

The first oil from the Ekofisk field was produced by the Gulftide jack-up rig in 1971.
All told, a total of 35 installations have been operational in the Greater Ekofisk Area, and they are described here.
Since 1998 14 steel platforms as well as the top section of the Ekofisk tank, designated Ekofisk I, have been removed.

No posts.
No posts.
No filter selected.